Add to Favorites Homepage 中文
Home About Us Services NEWS Join Us
      Your current location: >> News >> 内容阅读
All bridges to Vallarpadam terminal completed
  Date:05/18/10  |  From:cargonewsasia  |  Click:

The International Container Transhipment Terminal (ICTT) project at Kochi reached two milestones with the arrival of six rubber-tyred gantry cranes, the first of a batch of 15 to be deployed for yard operations; and completion of all 11 bridges for the National Highway connectivity for the project, the Hindu reported.

The completion of the road connectivity is the more significant of the two, the road connectivity being central to the project's proposed soft launch in July.

Previous:Strike could set South African ports back half a year
Next:Port Botany to turn away late trucks

Operation Center: 1008Room,Sealand Plaza,Guanghua Street,Changzhou,Jiangsu Province,China Tel :(+86)519-86699708/86699728 turn 8008/8028 ,HotLine 4006-246-768
Copyright 2009 - 2009 © Jinling Sinotrans
苏ICP备06023081号 Technical support:CalmLab